Tadevosyan ZB 19-6702
- A-1 APPLICATION
- A-2 PETITION ON APPEAL
- A-3 VARIANCE APPLICATION
- A-4 ZONING OFFICER''S DENIAL
- A-18 SITE PLAN -GIEGERICH ARCHITECT
- A-19 PLOT PLAN - CONCEPT ENGINEERING
- A-20 CME REVIEW #1 DATED 010720
- A-21 Survery Of Property dated 6-25-19
- A-22 -Letter of Supplemental Completeness 7-7-20
ZB 19-6694 Fredrick and Mary Reck
- A- 1 Application for Hearing
- A -21 InSight subdivision check list dated 10-15-19 - Copy
- A-2 VARIANCE APPLICATION
- A-3 PETITION ON APPEAL
- A-4 Zoning Officers Denial dated 11-05-19
- A-16 Check List for Bulk Variance
- A-17 - USE VARIANCE CHECK LIST
- A-20 Survey Prepared by Justin Hedges, PLS, revised 9-13-20 1 page
- A-22 - CME #1 REVIEW, DATED 11-12-19
- A-23 Fire Offical Report dated 2-11-20
- A-25 Hudson Street Subdivision Plan Revised 42920
- A-26 Township Traffic & Safety dated 5-19-20
- A-27 Fire Bureau update dated 5-15-20
ZB 18-6670 Tennent Road Wash & Lube
- A-1 Application for Hearing
- A-18 Variance Plan by Cramer Engineering dated 9-13-18-1
- A-19 Floor Plan
- A-20 Topographic Survey
- A-21 Cover Sheet Full Plans 2-6-2020
- A-23 Traffic Rev#1
- A-24 CME Rev#1
- A-25 CME REVIEW DATED 032020
- A-26 CME Technical Review 1 Preliminary and Final Site Major Site Plan dated 3-20-20
- A-27 Enviormental Impact Study by Crammer Eng. dated 5-29-20
- A-28 Preliminary and Final Site Plan dated 5-29-20 13 pages
- A-31 CME Use Variance Review # 2 dated 3-21-19
- A-32 CME Use Variance Engineering and Planning Review # 3 dated 4-24-19 Rev. #3
- A-35 Fire Official Updated Report dated 5-4-20
- A-36 Traffic Review by Dolan & Dean dated 11-19-18
- A-38 Bulk Variance Engineer Review # 2 dated 6-5-20
- A-40 Variance Plan dated 6-9-20
- A-42 Annual Groundwater Discharege Analysis dated 7-1-20
- A-43 Revised Site Plan Renderign dated 7-2-20
- A-44 Jellyfish JFS10408 Standard Detail Surface Inlet Configuration Specifications
- A-45 Soil Investigation by Two River Engineering dated 7-1-20
- A-46 Engineer letter addressing changes to original plan dated 7-2-20
Bubble Works Auto Spa 19-6698
- A-1 - APPLICATION FOR HEARING
- A-2 - VARIANCE APPLICATION
- A-17 -Traffic Review MCDONOUGH REA ASSOCIATES 110119
- A-18 - MONMOUTH COUNTY PLANNING BD GRANTING EXEMPTION 110619
- A-19 Amended Site Plan dated 090919
- A-21 CME REVIEW #1
- A-22 FIRE OFFICIAL REPORT 021320
- A-23- MARLBORO TRAFFIC & SAFETY REPORT 030320
- A-24 TRAFFIC ENGINEER REPORT DATED 030620
- A-25 Revised Vacuum Station Location Site Plan dated 6-12-20
- A-26 CME Engineer Review # 2 dated 7-8-20
- A-27 Traffic Review #2 by RVE dated 7-8-20